How do you work out 72v, some of hat you say doesn't make sense.
52v is 14s so max charge is 58.8v.
The cut out voltage is what ever the BMS is set up which will be higher then the controller cut off, typically one would look at about 45v for min cut off value which is 3.21v per cell group.