March 25, 20224 yr Hi guys, I'm in a bit of a pickle here, So I build myself an steath bomber a year ago and I ran thru a lot of different parts to see what would work better or just work without blowing. So I have a bafang rear hub it's a 1000w 48v geared hub (I can provide a model number if needed don't have it on hand right now) I'm running two batteries in series 2x 36v 15ah batteries they are the same I did that to achieve higher voltage and power. I was running 50£ dual mode controller that can handle 84v and 40A no problem and they always end up with a transistor blown o some other. I would like to upgrade to a sabvaton controller so I could program it and be available to controll the power so I don't end up changing controllers every 3months. And plus one of the batteries has gone to sleep and I gonna need to wake up the bms the battery is in mint condition its just been sitting for a couple of months. If I could kindly get some help would be much appreciated. I can provide more info on all components just let me know what exactly what is needed. Thank you in advance everybody
Join the conversation
You are posting as a guest. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.