................what it will be like should the proposal ever come to fruition. (In my lifetime?)
THE CRICKLADE COUNTRY WAY
I've often toyed with the idea of riding this route as it is, before any work begins on the projected plans. The Swindon & Cricklade Railway guys have already started work at Mouldon Hill Lake, including laying the foundation layer prior to re-laying the tracks. This first layer of ballast is 3" stone, almost impossible to walk on let alone ride a bike on it.
Just around the bend, the tracks are still in place, and a bit further on is the Station just off Tadpole Lane. From there the guys run regular but short steam train rides.
By the year 2020, the track will be extended from Mouldon Hill and through to Cricklade allowing a much longer run.
Looking towards the lake, which is behind the trees. The pile of platform slabs show where the proposed station will be.
Currently, there is no cycle route through this two mile section and had to be bypassed with a couple of miles road riding on the B4553.
The route from the lake to the B4553 can be clearly seen.
A brief stop to don my hi-viz waistcoat before joining the B4553.
Blaze orange is my preferred colour for rural riding, it stands out well against hedgerows and grass banks. It's entirely possible I might disappear if riding past a field of poppies in bloom, fortunately, in Swindon, exotic farming of this nature is carried out in rented semi's with rather high electricity usage, not that the meter will record it.
Part two to follow..................
THE CRICKLADE COUNTRY WAY
I've often toyed with the idea of riding this route as it is, before any work begins on the projected plans. The Swindon & Cricklade Railway guys have already started work at Mouldon Hill Lake, including laying the foundation layer prior to re-laying the tracks. This first layer of ballast is 3" stone, almost impossible to walk on let alone ride a bike on it.

Just around the bend, the tracks are still in place, and a bit further on is the Station just off Tadpole Lane. From there the guys run regular but short steam train rides.
By the year 2020, the track will be extended from Mouldon Hill and through to Cricklade allowing a much longer run.
Looking towards the lake, which is behind the trees. The pile of platform slabs show where the proposed station will be.

Currently, there is no cycle route through this two mile section and had to be bypassed with a couple of miles road riding on the B4553.
The route from the lake to the B4553 can be clearly seen.

A brief stop to don my hi-viz waistcoat before joining the B4553.

Blaze orange is my preferred colour for rural riding, it stands out well against hedgerows and grass banks. It's entirely possible I might disappear if riding past a field of poppies in bloom, fortunately, in Swindon, exotic farming of this nature is carried out in rented semi's with rather high electricity usage, not that the meter will record it.
Part two to follow..................