August 15, 20187 yr Whilst waiting for the parts for my build its going to be a few days before they arrive I started looking at the pile of unused bits motor wheels etc and look what fell into my lap was only 2 min away
August 15, 20187 yr Author The only bits left will be the frame forks seat post pedals and handlebar's the wheels are 29er now 9speed every bit has been leftover from previous builds
August 17, 20187 yr Author The bottom bracket meets angle grinder chain line now good in all 9 gears Triangle battery pack in luna cycles bag done reinforced with 20mm plastic conduit with dowel glued inside hydraulic brakes 203 mm discs done, cut out on rear only It is getting there will be finished before all the bits arrive for the zebop build snail mail
August 17, 20187 yr Author Test ride went ok:) needs to go on the laptop keep current etc:rolleyes: Will need to sell it to fund the zobop build The luna bag works now the battery weight is suspended from the frame the 27ah triangle battery and the 350watt should be a good combination
August 19, 20187 yr Author Finished on ebay to fund the Zobop build bbshd and 52 v battery https://www.ebay.co.uk/itm/113211102616?ssPageName=STRK:MESELX:IT&_trksid=p3984.m1555.l2649
August 20, 20187 yr Its a beast - a lot of hard work I can only imagine, far too fast for me though - good luck with the Zobop build!
August 20, 20187 yr Finished on ebay to fund the Zobop build bbshd and 52 v battery Peter, don't forget to allow for the larger gear housing on the HD, 67mm min. from centre of BB to chain stay, or you will need more than asprin to crush the pain:eek:
August 20, 20187 yr Author I just checked looks about 71-72 mm thanks for that now just got to sort the battery fit
Join the conversation
You are posting as a guest. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.